Road Maintenance Phase 2

Description

Construction of a dual carriageway from Al-Mahalah Roundabout to Al-Mahalah Stadium, with a length of 4.5 km, including excavation, backfilling, asphalt, and sliding curbs in the median strip, maintenance of Prince Sultan Road in Abha, construction of box and tube culverts, retaining walls, scraping, and asphalting of the Al-Rawabi plan.

Projects Number

  • 19/007/001/30010402/22424

Entity

  • Asir Municipality

Executed Work

  • Earthworks – Asphalt – Traffic Safety – Flood Drainage Constructions

Category

  • Road rehabilitation and maintenance

Other Projects

0